HydroBase factory weaving floor technical production
Technical Resources

Specification-Grade Documentation

Datasheets, GRI GT16 test reports, installation guides, BOQ templates, and specification clauses — all available on request, returned within 24 hours.

24 hr
Document Turnaround
GRI GT16
Compliance Standard
ISO 17025
Accredited Lab Testing
3 Variants
Standard, Filter Point, Vegetated
Document Library

What We Provide

Every document is written for engineers and specifiers — not sales material. Request any or all by email.

Standard Document

Product Datasheets

Technical data tables and cross-section drawings for Standard, Filter Point, and Vegetated grouted mattress. Includes thickness range (50–200 mm), material properties, and reference standards.

  • All 3 product variants
  • Thickness and weight tables
  • GRI GT16 property summary
  • Cross-section drawings
On Request

GRI GT16 Test Reports

Third-party laboratory test results from ISO 17025-accredited facilities. Batch-specific reports available on request for any project requiring traceable test data.

  • Tensile strength (warp & weft)
  • Seam integrity results
  • Hydraulic conductivity
  • UV resistance (500 hr)
Standard Document

Installation Guides

Step-by-step installation instructions covering site preparation, fabric layout, concrete mix design, pump specification, injection sequence, curing, and inspection checklist.

  • Fabric layout and seaming
  • Concrete mix design template
  • Pump equipment selection
  • Post-installation inspection
On Request

BOQ Templates

Bill of quantities item descriptions in FIDIC and NEC format - ready to insert directly into your specification documents. Includes measurement rules and provisional items.

  • FIDIC-format items
  • NEC-format items
  • Measurement rules
  • Provisional sums guidance
On Request

Design Assistance Notes

Application-specific notes reviewed by HydroBase engineers: thickness selection by flow velocity, anchor design, toe detail options, and mix design for site conditions.

  • Velocity vs thickness chart
  • Anchor detail options
  • Toe and crest details
  • Mix design by temperature
On Request

Specification Clauses

Ready-to-use specification clauses for grouted geotextile mattress suitable for inclusion in project specifications. Compatible with most national standards frameworks.

  • Material specification clause
  • Installation method clause
  • Testing & acceptance criteria
  • Inspection hold points
How to Specify

Grouted Mattress in Your BOQ — 4 Steps

01
Define the Application
Canal lining, slope protection, or bridge pier scour - each has different thickness and type requirements. Tell us the application and we'll advise on the correct product variant.
02
Confirm Site Hydraulics
Flow velocity, slope angle, water depth, and soil conditions determine the minimum required specification. Send us your hydraulic data and we confirm the design.
03
Request the Document Package
Email james@concretemattress.com with your project name and application. We return datasheet, test report, installation guide, and BOQ template within 24 hours.
04
Issue to Your Specification
All documents are formatted for direct insertion into your specification. The BOQ item descriptions reference GRI GT16 as the primary compliance standard.
HydroBase factory weaving worker at production machine
Quality inspection at HydroBase factory
Factory production floor
Standards & Compliance

Test Standards & Reference Documents

GRI GT16
Grouted Geotextile Mattress
Geosynthetic Research Institute

Primary product standard for grouted geotextile mattress systems. Specifies test methods and performance requirements for all material properties.

ASTM D4595
Tensile Properties of Geotextiles
American Society for Testing and Materials

Wide-width strip tensile test method used to determine tensile strength and elongation of geotextile fabric components.

ASTM D4716
In-Plane Flow Rate
American Society for Testing and Materials

Test method for in-plane hydraulic conductivity and transmissivity of geotextiles under load.

ISO 17025
Lab Competence Accreditation
International Organization for Standardization

Accreditation standard for the testing laboratories that perform our third-party batch tests. Ensures results are traceable and defensible.

ASTM D4833
Puncture Resistance
American Society for Testing and Materials

Index puncture resistance test used to confirm the geotextile mould can withstand site handling and grout injection pressures.

ASTM G154
UV Resistance (Xenon Arc)
American Society for Testing and Materials

Accelerated weathering test verifying product UV resistance for above-grade applications exposed to sunlight before grouting.

FAQ

Common Specification Questions

What standard should I reference in my BOQ?

Reference GRI GT16 (Geosynthetic Research Institute Geotextile Test Method GT16) as the primary material standard. Our BOQ template includes the correct reference format for FIDIC and NEC specifications.

Are third-party test reports available for each batch?

Yes. We maintain batch-specific test reports from our ISO 17025-accredited testing lab. Batch reports can be requested for any order — they reference the specific production batch dispatched to your project.

Can you provide a mix design for the grout?

Yes. We provide a concrete mix design tailored to your pump equipment, aggregate availability, and ambient temperature. This is included in our engineering support at no extra cost.

Do your documents work for EU-funded projects?

Yes. Our test reports reference ASTM test methods which are accepted under EU technical approval frameworks for geosynthetics. For projects requiring specific CE mark documentation, contact us and we will advise on a case-by-case basis.

How quickly can you return the document package?

Standard document package (datasheet + test report + installation guide + BOQ template) is returned within 24 hours of email request to james@concretemattress.com.

Can you provide a design review for my project?

Yes — for qualified orders our engineers will review your hydraulic data and confirm the mattress specification, including product type, thickness, anchor details, and concrete mix design. This is provided free of charge.

Request Checklist

What to Send Us

To return the right specification for your project, it helps to know the following. You don't need to have all of these — send what you have and we'll ask for anything critical that's missing.

Application type (canal, slope, scour)
Total area (m²) or linear length
Design flow velocity (m/s)
Slope angle (if applicable)
Water depth (if underwater)
Site location / country
Project timeline and start date
Delivery port or address
HydroBase installation crew on a project site
24-Hour Response
Full document package returned within 24 hours of your email. No portals, no registration, no download limits.

Request Your Document Package

Email james@concretemattress.com with your project name and application type. Full package returned within 24 hours.

Chat on WhatsApp