Aerial view of completed canal lining project
Project Portfolio

230+ Grouted Mattress Installations

Canal lining, slope protection, bridge pier scour, and river training — delivered factory-direct across China and worldwide.

230+
Total Installations
4
Application Types
10M+ m²
Total Area Installed
30+
Countries Served
Featured Project

South-to-North Water Diversion Canal

Aerial view of diversion canal lining
Aerial canal lining with pump arm in farmland
Completed canal lining section
Crew pumping grout on canal slope
Canal LiningInner Mongolia, China100 mm — GRI GT16

High-Specification Canal Lining on a National Water Scheme

HydroBase supplied and supported the installation of grouted mattress lining on a section of the South-to-North Water Diversion Project — one of China's most significant water infrastructure programmes. The project required GRI GT16-compliant product with third-party QA oversight and full documentation.

Two pump trucks operated simultaneously, achieving 1,200+ m²/shift. The canal remained in partial flow throughout installation — no dewatering or bypass channel required. Completed ahead of schedule with zero reportable incidents.

85,000 m²
Area
100 mm
Thickness
11 weeks
Duration
Our Work

Selected Installations

Browse by application type. Every project was designed, supplied, and supported by HydroBase.

Yangtze Irrigation Canal Lining
Canal Lining62,000 m²
Yangtze Irrigation Canal Lining
Hubei Province, China-2022
3.2 km of grouted mattress lining on a primary irrigation canal. Installed without flow interruption across two construction seasons.
Yellow River Bank Protection
River Training28,000 m²
Yellow River Bank Protection
Inner Mongolia, China-2023
Filter point grouted mattress on 1.8 km of Yellow River training works. Installed under live flow with 48-hour panel fabrication turnaround.
G30 Lianhuo Highway Embankment
Slope Protection45,000 m²
G30 Lianhuo Highway Embankment
Gansu Province, China-2021
Slope protection on 4.5 km of highway embankment. Vegetated grouted mattress, 100 mm, installed on 1:2 slope.
Mekong Delta Irrigation Canal
Canal Lining31,000 m²International
Mekong Delta Irrigation Canal
Mekong Delta, Vietnam-2023
Standard grouted mattress lining on a primary irrigation canal in the Mekong Delta. GRI GT16-certified product with full test documentation. Shipped FOB Tianjin, delivered in 22 days.
Pearl River Bridge Pier Scour
Bridge Pier12 piers
Pearl River Bridge Pier Scour
Guangdong Province, China-2022
Scour protection around 12 bridge piers on a major Pearl River crossing. Custom pier collar panels installed underwater — no river closure.
Fujian Coastal Seawall Revetment
Slope Protection38,000 m²
Fujian Coastal Seawall Revetment
Fujian Province, China-2023
Grouted mattress revetment on 2.4 km of tidal seawall. Filter point variant installed in live tidal conditions — no dewatering.
South-to-North Water Diversion Canal
Canal Lining85,000 m²
South-to-North Water Diversion Canal
Inner Mongolia, China-2021
High-specification grouted mattress lining on the South-to-North Water Diversion Project. GRI GT16-compliant with third-party QA oversight.
Reservoir Slope Protection
Slope Protection42,000 m²International
Reservoir Slope Protection
East Africa-2024
Upstream face protection on an earth-fill reservoir supplying irrigation water to 12,000 hectares of agricultural land. CIF Mombasa delivery. Local installation crew trained by HydroBase engineer.
Inner Mongolia Reservoir Slope
Slope Protection22,000 m²
Inner Mongolia Reservoir Slope
Inner Mongolia, China-2022
Standard grouted mattress on the upstream face of a mountain reservoir. Installed against ice action and wave overtopping.
Mining Pond Slope Stabilisation
Slope Protection45,000 m²
Mining Pond Slope Stabilisation
Shanxi Province, China-2023
Large-scale slope protection on a mining water retention pond. Aerial grouting with pump boom crane across 45,000 m² of battered slope.
Coastal Revetment — Underwater Works
Bridge PierDiver install
Coastal Revetment — Underwater Works
Zhejiang Province, China-2023
Scour protection at the toe of a coastal revetment. Diver-guided placement in up to 5 m water depth — no dewatering or cofferdam.
Tuoyouqi Farmland Canal Network
Canal Lining42,000 m²
Tuoyouqi Farmland Canal Network
Inner Mongolia, China-2022
Grouted mattress lining on multiple lateral irrigation canals serving large-scale agricultural operations. Installed during winter shutdown to minimize disruption to seasonal irrigation.
Xinjiang Desert Reservoir Lining
Slope Protection18,000 m²
Xinjiang Desert Reservoir Lining
Xinjiang, China-2021
Grouted mattress slope protection on an irrigation reservoir in arid conditions. Installed to prevent seepage loss and slope erosion in a harsh desert environment.
Northwest Mountain Reservoir Protection
Slope Protection30,000 m²
Northwest Mountain Reservoir Protection
Gansu Province, China-2023
High-altitude reservoir slope protection with grouted mattress on the upstream face. Installed against ice action and seasonal freeze-thaw cycles at 2,400 m elevation.
Farmland Irrigation Canal Lining
Canal Lining35,000 m²
Farmland Irrigation Canal Lining
Hebei Province, China-2022
Standard grouted mattress lining on a network of irrigation canals through golden wheat farmland. Two pump units operating simultaneously achieved 1,000+ m²/shift.
Reservoir Dam with Solar Integration
Slope Protection25,000 m²
Reservoir Dam with Solar Integration
Northwest China-2024
Upstream face protection on an earth-fill dam adjacent to a solar energy installation. Standard grouted mattress resists wave action and drawdown at this dual-use site.
Irrigation Canal Lining — GCC
Canal Lining78,000 m²International
Irrigation Canal Lining — GCC
Gulf Region, Middle East-2024
Large-scale irrigation canal lining on a national water infrastructure programme. GRI GT16-certified, hot-climate UV resistance tested. Shipped CIF to Jebel Ali. Documentation package in English and Arabic.
Industry Coverage

Sectors We Serve

Water Infrastructure

Water Infrastructure

Irrigation schemes, water conveyance canals, South-to-North diversion, and drainage networks. Canal lining without dewatering.

Transportation

Transportation

Highway and railway embankments, road cuttings, and retaining structures. GRI GT16-compliant slope armour.

Dams & Reservoirs

Dams & Reservoirs

Upstream face protection on earth fill dams. Withstands drawdown, wave action, and ice loading.

Mining & Industry

Mining & Industry

Tailings pond slopes, water retention pond armour, and industrial channel lining. Chemical-resistant concrete.

How We Work

From Inquiry to Installation

01

Inquiry & Specification

Submit project details, site dimensions, and hydraulic conditions. Our engineering team reviews and responds within 48 hours.

02

Engineering Review & Quote

We return a product recommendation, BOQ template, and unit price. Design package included on qualified orders.

03

Manufacturing & QC

Panels fabricated to your dimensions on 150+ production lines. Every batch tested before dispatch. GRI GT16 certificates issued.

04

Dispatch & Site Support

48-hour dispatch. Engineering support available by phone or on-site during installation. Full QC documentation delivered.

Start Your Project

Tell us your application type, site dimensions, and timeline. We'll return a product recommendation and BOQ within 48 hours.

Chat on WhatsApp